Off-Grid Solar for Cayo Costa, North Captiva, Useppa and Keewaydin

Hurricane Ian made landfall on Cayo Costa in 2022. On an island with no bridge and no utility, the nearest help is a boat ride away, every part arrives on a deck, and the system has to survive September, not just April.
I have done off-grid island work for more than 25 years. That is not a marketing line. It is why we size for the worst month, plan the boat before the schedule, and tell you plainly when a repair is not worth the money.
The outer islands at a glance
- Electric utility: None on Cayo Costa and Keewaydin, so every kilowatt-hour comes from the sun, a battery or a generator. Some other islands, including Useppa and Cabbage Key, are served by LCEC.
- Permits issued by: Lee County for Cayo Costa, North Captiva and Useppa; Collier County for Keewaydin
- Flood risk: Surge on every island, with most homes built on stilts
- Wind exposure: The highest of any area we serve

What off-grid on a barrier island demands
Design for September
September means the full cooling load, about 12 hours of daylight and afternoon storms nearly every day. A system that looks oversized in April can come up short at the end of summer. We size for the hard month and are honest about the tradeoffs, including what the generator will have to cover.
Generator fuel arrives by boat
Fuel costs more out here, and it comes in cans on a boat. Most generator auto-start controllers watch only the battery’s state of charge, so they start the engine when they should not. We tune the start logic so the generator runs only when it needs to, and for as short a time as it can.
Stilt homes make battery placement hard
Fire code limits and flood elevation leave few good places for a battery bank on an elevated home. We find compliant ones, sometimes with a dedicated equipment room, instead of tucking a rack under the stairs.
A battery bank has to reach full charge
Banks that never hit 100 percent drift out of balance and fault. We design so the system can fully charge on a regular basis, which also means telling owners when their loads make that impossible.
Ian, a destroyed park and a long wait for help
Florida State Parks described Ian as a devastating Category 4 storm that destroyed much of the Cayo Costa park’s infrastructure. In its update after the storm, the park reported no electricity and no drinking water on the island and no ferry service yet, and it welcomed back only boaters and kayakers.
That is the baseline for a private home on the same island. Nobody is coming to restore power because there is no power to restore. Your system is the grid, so reliability matters more than rated output.
Islands we plan around
- Cayo Costa: Ian’s landfall, with boat access only.
- North Captiva: island cottages and stilt homes.
- Useppa: a private island community served by LCEC rather than off-grid.
- Keewaydin: Collier County, south of Gordon Pass, permitted through Collier County.
Our work on the outer islands
Keewaydin is where most of our recent island work sits. Our records show 14 completed jobs there, most since 2024, including new installs, battery additions and repairs. One 2026 job was a metal-roof system with two inverters and a four-battery bank. We also did 2026 installs on two Cayo Costa properties and service work on another Cayo Costa system.
Aging island systems need a plan that covers the haul-away of old batteries as well as the replacement.
Across Lee and Collier Counties we have completed thousands of jobs, and that count includes service and repairs.
How we design off-grid systems
- Systems sized for the worst month, not the best
- Generator auto-start tuned for fuel cost and engine hours
- Battery banks that can reach full charge for balancing
- Replacement of aging lead-acid systems, including removal of the old batteries
- Equipment placed above flood elevation and within fire code
- Boat logistics built into the quote and the schedule
Island questions we hear
My old battery bank is failing. Can you just replace the batteries?
Sometimes. But aging lead-acid systems usually have inverters and wiring of the same age. We tell you whether a battery swap is enough or whether it is time for a modern system.
Do you really work on the islands?
Yes. I have done off-grid island work for more than 25 years, and our jobs on Keewaydin and Cayo Costa are in our records from recent years. Boat logistics shape how we plan, price and schedule.
Does an off-grid system need a permit?
Yes. Off-grid systems are permitted and inspected like any other electrical work, by Lee County or Collier County depending on the island.
How long does an island job take?
Longer than a mainland job of the same size, because weather and tides decide the boat days. We give you a realistic window and tell you early when it changes.
Start with the boat and the loads
Tell us which island, how you get there, and what you run. We will ask the right questions before we draw a single panel.